Deployment Techniques of Turnstile and Cross-Polarized for Satellite Reception
Date: 2026-01-13
- Survey the site for clearance and safe anchor points.
- Avoid power lines and metal structures.
- Keep feed line routing consistent to reduce detuning.
Date: 2026-01-13