Deployment Techniques
Date: 2026-01-12
- Survey the site for clear spans, trees, and safe anchor points.
- Keep the wire away from power lines and public access areas.
- Use a throw line or mast to elevate the far end.
- Tension gently to reduce sag while avoiding overstress.
- Route feed line downward to reduce RF on the line.